Representative photo. Please check item description for details.

TYPE J T/C UNGROUNDED 5.5"SHEATH ALUM HEAD W/LONG LEADS

https://www.branom.com/web/image/product.template/174183/image_1920?unique=33d81e5
(0 review)

Manufacturer: Pyromation Inc.

Mfg Product Code: J48U-005(1/2)-00-8HN31Z

Weight: 1.0 lb(s)

On Hand: 2

49.20 49.2 USD 49.20

49.20

Not Available For Sale

  • Measurement Maximum
  • Measurement Minimum

This combination does not exist.

TYPE J T/C UNGROUNDED 5.5"SHEATH ALUM HEAD W/LONG LEADS

  • Measurement Maximum
  • Measurement Minimum

49.20 49.2 USD 49.20

49.20

Not Available For Sale

This combination does not exist.


Measurement Maximum:0
Measurement Minimum:0


Specifications

Measurement Maximum 0
Measurement Minimum 0